Yeah, dad decided that the bathroom should have been on the other side of the room and the study also needed an attached bathroom. So two new bathrooms are being constructed and my poor bathroom is being demolished (sort of) to be converted to a servant quarter.
So right now I have been relocated to Surabhi’s room. 🙁 I miss my room. If you want I can post pictures of the mess my bathroom is in right now: the door was demolished and is going to be blocked, and a new door is being created at the other end of the bathroom. The nice shelves etc are also being demolished.
The study is in a worse shape. Over there pretty much the entire wall has been broken down. Right now they are in the process of digging up the floor to lay down the pipes etc for the sewage connection. So as soon as you enter the house it looks like a trench is being dug across the open space.
This is all for now. Will post more later.
– Suramya